Ai, The Jin and Astanti, Ririn Diar and Bintoro, Ag. Gatot and Wibowo, Thomas Indarto Three Approach to Find Optimal Production Run Time of an Imperfect Production System. In: Prosiding Seminar Internasional, Semester Gasal 2013/2014.
|
Text
IIE Asian Three Approaches.pdf Download (275kB) | Preview |
|
|
Text
23 Peer Review.pdf Download (589kB) | Preview |
|
|
Text
Turnitin 23 IIE Asian Three Approaches.pdf Download (1MB) | Preview |
Abstract
This paper is an extension of the work of Lin and Gong (2011) on Economic Production Quantity (EPQ) model on an imperfect production system over infinite planning horizon, where the production system is dictated by two unreliable key production subsystems (KPS). While any shortage on the inventory of product was not allowed in the model of Lin and Gong (2011), planned shortage backorders is considered in the model proposed in this paper. The mathematical model is developed in order to determine production run time (τ) and production time when backorder is replenished (T 1) that minimizes the expected total cost per unit time including setup, inventory carrying, shortage, and defective costs. Approaches to solve the model are also being proposed in this paper, altogether with some numerical examples.
Item Type: | Conference or Workshop Item (Paper) |
---|---|
Uncontrolled Keywords: | Economic production quantity model Shortage backorders Imperfect production system Optimization technique Approximation method |
Subjects: | Teknik Industri > Sistem Manufacturing |
Divisions: | Fakultas Teknologi Industri > Teknik Industri |
Depositing User: | Editor UAJY |
Date Deposited: | 07 Sep 2016 09:31 |
Last Modified: | 27 Aug 2019 02:25 |
URI: | http://e-journal.uajy.ac.id/id/eprint/10272 |
Actions (login required)
View Item |