PUTRIANI, OKKIE (2016) PARKING CAPACITY ANALYSIS (Case Study: Parking Area Tugu Yogyakarta Railway Station). S1 thesis, UAJY.
Text (Halaman Judul)
0TSI11461.pdf Download (12MB) |
|
Text (Bab I)
1TSI11461.pdf Download (746kB) |
|
Text (Bab II)
2TSI11461.pdf Download (208kB) |
|
Text (Bab III)
3TSI11461.pdf Download (304kB) |
|
Text (Bab IV)
4TSI11461.pdf Restricted to Registered users only Download (442kB) |
|
Text (Bab V)
5TSI11461.pdf Restricted to Registered users only Download (1MB) |
|
Text (Bab VI)
6TSI11461.pdf Download (1MB) |
Abstract
PT KAI Daops 6 Yogyakarta (2015) imposed a new parking area from east side of Tugu Railway Station to west side of the station or the area Bong Suwung with area covered 6,714m2 accommodated 170 cars and 450 motorcycles. Nevertheless in reality the parking lot and road were often jammed. The proposed of these research was to evaluate the capacity analysis oth the available parking in Tugu Yogyakarta Railway Station. Using three samples in different days: weekend (Saturday, April 23, 2016), holiday (Thursday, May 5, 2016), and regular day (Tuesday, May 24,2016). Using in-out survey the occupancy count in the selected parking lot is taken, the data would be calculated and reviewed. The maximum accumulation was happen on holidays, and the capacity car parking was unavailable enough. The parking system had to be maintained not only in entrance-exit gates but also in the pick-up/arrival vanue. In these final report were given alternative solution.
Item Type: | Thesis (S1) |
---|---|
Uncontrolled Keywords: | railway station, parking, Tugu Yogyakarta, parking capacity, turnover, accumulation |
Subjects: | Civil Engineering > Transportation |
Divisions: | Fakultas Teknik > Teknik Sipil Internasional |
Depositing User: | Editor UAJY |
Date Deposited: | 26 Oct 2016 08:22 |
Last Modified: | 26 Oct 2016 08:22 |
URI: | http://e-journal.uajy.ac.id/id/eprint/10571 |
Actions (login required)
View Item |