LEAN CONCEPT OF HYBRID AUTOMATION ASSEMBLY LINE X CO. USING LINE BALANCING AND ECRS TECHNIQUE

JORI, JEREMY DESMOND (2018) LEAN CONCEPT OF HYBRID AUTOMATION ASSEMBLY LINE X CO. USING LINE BALANCING AND ECRS TECHNIQUE. S1 thesis, UAJY.

[img] Text (HALAMAN JUDUL)
TII073870.pdf

Download (1MB)
[img] Text (BAB I)
TII073871.pdf

Download (384kB)
[img] Text (BAB II)
TII073872.pdf

Download (549kB)
[img] Text (BAB III)
TII073873.pdf
Restricted to Registered users only

Download (936kB)
[img] Text (BAB IV)
TII073874.pdf
Restricted to Registered users only

Download (2MB)
[img] Text (BAB V)
TII073875.pdf
Restricted to Registered users only

Download (1MB)
[img] Text (BAB VI)
TII073876.pdf

Download (474kB)

Abstract

X Co. Ltd. is an industrial company that running in electronical device that already well known about their quality of HDD (Hard Disk Drive) for computer and another storage devices. Lean approach and technique that have been used to improve in X Co. Lean technique lately in the production line, Lean is really helpful to achieve their targeted cycle time in the production line. Method to conduct lean technique in the production line is line balancing and ECRS (Eliminate, Combine, Re-arrange, and Simplify) technique which can modify and improve some process steps in the production line. Target that have been approached by improving labor productivity and unit per hour in the assembly production line, which those can be done by eliminating some worker or reducing cycle time for improving the production line. Some method of line balancing and Lean already been applied in the production line, which in this case is improving hybrid automation assembly line that consists of man and machine, cycle time in the production line whether in the main production line called in-line and support operator in the production line called offline. After the implementation and option have been calculated there are some reducing HC in the in-line Apollo hybrid automation line by reducing 1 operator in the Gasket Install and there are some productivity HSA increase 6% from the calculation 28.57 HSA / HC before become 30.25 HSA / HC after ECRS technique has been applied. Meanwhile in the off-line there are some improvement from 39 HC needed become 36 HC by combining some jobs in the Material Handling operator in the support line which lead into increasing 7% of labour productivity, thus saving the company cost by $20,400/ year from in-line and $61,200/ year from off-line accordingly.

Item Type: Thesis (S1)
Uncontrolled Keywords: Lean Approach, Lean Technique , Line Balancing, ECRS , Productivity
Subjects: Industrial Engineering > Production and Inventory Management
Divisions: Fakultas Teknologi Industri > Teknik Industri Internasional
Depositing User: Editor UAJY
Date Deposited: 05 Mar 2018 12:46
Last Modified: 05 Mar 2018 12:46
URI: http://e-journal.uajy.ac.id/id/eprint/14128

Actions (login required)

View Item View Item