HANDOYO, RICO SHANDY (2018) INCREASING THE PRODUCTION CAPACITY IN A FURNITURE MANUFACTURER USING ROUGH-CUT CAPACITY PLANNING (RCCP). S1 thesis, UAJY.
|
Text (HALAMAN JUDUL)
TII076790.pdf Download (3MB) | Preview |
|
|
Text (BAB I)
TII076791.pdf Download (380kB) | Preview |
|
|
Text (BAB II)
TII076792.pdf Download (1MB) | Preview |
|
Text (BAB III)
TII076793.pdf Restricted to Registered users only Download (564kB) |
||
Text (BAB IV)
TII076794.pdf Restricted to Registered users only Download (1MB) |
||
Text (BAB V)
TII076795.pdf Restricted to Registered users only Download (1MB) |
||
|
Text (BAB VI)
TII076796.pdf Download (1MB) | Preview |
Abstract
Customer satisfaction is a critical factor for the development of enterprises and to keep them in a todays’ business competition. Therefore, the enterprises should be able to provide the best of their products or services with the purpose of fulfilling their needs. In order to perform well, there are several key factors that are important to be considered, such as the quality of the product, the product price, availability of the products, and the others. This research concern about the production capacity in a manufacture which inline with the company’s ability to produce their product on time. The main objective of this research is to analyze how many additional resources (man power) needed in order to anticipate the increment of demand in the future condition. Since the company does not have any data related with its production time for each type of family product, therefore time study analysis is used in this research as the basic of calculating the production time. The capacity planning itself is done by using Rough-Cut Capacity Planning (RCCP) as it is used to analyze the aggregate production order. The result of this research is about the number of workers in each production department. There are some workers in a production department which are transferred to the another in order to balance the production system. Three workers in Sanding department are moved into Finishing department, and one additional worker is added to each of Woodworking, Finishing and Packing department. The adjustments are needed to maintain the departments’ utilization of 50-60% for Sanding, Finishing and Packing department, and 75-80% for Woodworking department, as the limit of the production department in this research. The second alternative is by removing one worker from each of Finishing and Packing department from the first solution, and only add one worker to work in Finishing and Packing department alternately. But, in order to implement the second solution, further research is needed to be held.
Item Type: | Thesis (S1) |
---|---|
Uncontrolled Keywords: | Production Capacity, Capacity Planning, Rough-Cut Capacity Planning (RCCP), Time Study |
Subjects: | Industrial Engineering > Production and Inventory Management |
Divisions: | Fakultas Teknologi Industri > Teknik Industri Internasional |
Depositing User: | Editor UAJY |
Date Deposited: | 29 Jan 2019 04:46 |
Last Modified: | 29 Jan 2019 04:46 |
URI: | http://e-journal.uajy.ac.id/id/eprint/16180 |
Actions (login required)
View Item |