ARIWIBOWO, ANTONIUS ADITYO (2009) PENSERTIPIKATAN DAN PEMBEBANAN HAK GUNA BANGUNAN ATAS TANAH DI PERUMAHAN CITRA PANDAWA ASRI DALAM RANGKA MEWUJUDKAN KEPASTIAN HUKUM BERDASARKAN PERATURAN PEMERINTAH NOMOR 24 TAHUN 1997 DI KOTA BATAM. S1 thesis, UAJY.
|
Text (Halaman Judul)
0HK09145.pdf Download (383kB) | Preview |
|
|
Text (Bab I)
1HK09145.pdf Download (75kB) | Preview |
|
Text (Bab II)
2HK09145.pdf Restricted to Registered users only Download (188kB) |
||
|
Text (Bab III)
3HK09145.pdf Download (51kB) | Preview |
Abstract
This legal writing entitled “Certification and Securing of Right to Build on the Land in Citra Pandawa Asri Housing in Order to Actualize the Legal Certainty Based on Government Regulation Number 24, 1997 in Batam City”. The problem was whether the establishment of certificate of right to build on the land in Citra Pandawa Asri Housing in Batam City had gave legal certainty based on Government Regulation Number 24, 1997 and why the certificate of building right on the land in Citra Pandawa Asri Housing could not be burdened by right of security. The purpose of this legal writing was to know whether the establishment of certificate of building right on the land of house owner in Citra Pandawa Asri Housing in Batam City had gave legal certainty according to the Government Regulation Number 24, 1997 and to know why certificate of right to build on the land of house owner in Citra Pandawa Asri Building could not be burdened right of security. The method legal research used empirical legal rescarch. The result is certification of building right on the land in Citra Pandawa Asri Housing had actualized legal certainty based on Government Regulation Number 24, 1997 in Batam City and the reason of resistance of securing of building right is caused by reason of the respondent does not fulfil one of the criteria of 5C, i.e capacity. The recommendation submitted from this research is order the Development Authority of Industrial Area of Batam Island compile SOP (Standard Operational Procedure) in order the proposal on right of land is not conducted through the extensive process and takes longer time, as well as in order the proposal of credit is accepted by reason of there is still other criteria of 5C, i.e collateral (warranty)
Item Type: | Thesis (S1) |
---|---|
Uncontrolled Keywords: | right to build, security rights and legal certainty |
Subjects: | Ilmu Hukum > Pertanahan, Pembangunan dan Lingkungan Hidup |
Divisions: | Fakultas Hukum > Program Studi Ilmu Hukum |
Depositing User: | Editor UAJY |
Date Deposited: | 10 Jul 2013 08:34 |
Last Modified: | 10 Jul 2013 08:34 |
URI: | http://e-journal.uajy.ac.id/id/eprint/2905 |
Actions (login required)
View Item |