Up a level |
BAWONO, BAJU and Ai, The Jin and Astanti, Ririn Diar and Wibowo, Thomas Indarto (2013) An EPQ with Shortage Backorders Model on Imperfect Production System Subject to Two Key Production Systems. In: Institute of Industrial Engineers Asian Conference 2013, 2013, Institute of Industrial Engineers.
Ai, The Jin and Astanti, Ririn Diar and Bintoro, Agustinus Gatot and Wibowo, Thomas Indarto (2013) Three Approaches to Find Optimal Production Run Time of an Imperfect Production System. In: Institute of Industrial Engineers Asian Conference 2013, 2013, Institute of Industrial Engineers.
Ai, The Jin and Astanti, Ririn Diar and Bintoro, Ag. Gatot and Wibowo, Thomas Indarto An EPQ with Shortage Backorder Model on Imperfect Production System subject to Two Key Production Modules. In: Prosiding Seminar Internasional, 2013, Taipei.
Ai, The Jin and Astanti, Ririn Diar and Bintoro, Ag. Gatot and Wibowo, Thomas Indarto Three Approach to Find Optimal Production Run Time of an Imperfect Production System. In: Prosiding Seminar Internasional, Semester Gasal 2013/2014.
Wibowo, Thomas Indarto (2013) MODEL ECONOMIC PRODUCTION QUANTITY PADA DUA SUBSISTEM PRODUKSI TIDAK SEMPURNA DENGAN SHORTAGE. S1 thesis, UAJY.