Up a level |
Abi, Randi Selo (2011) BETTER WORK METHOD IN FINISHING DEPARTMENT, PT. MACANAN JAYA CEMERLANG, KLATEN. S1 thesis, UAJY.
CRUZ, NIZIA MARIA SARMENTO LOPES DA (2011) MAINTENANCE STRATEGY BASED ON RELIABILITY (CASE STUDY IN COOPERATIVA CAFÉ TIMOR, EAST TIMOR). S1 thesis, UAJY.
Damardjati, Pandu (2011) RAPID PROTOTYPING PROCESS OF BOROBUDUR STUPPA CHOCOLATE MOLD. S1 thesis, UAJY.
LIMANTORO, DANANG (2011) DEVELOPMENT OF SCHEDULING PROGRAM AT STAMPING TOOLS DIVISION P.T. MEKAR ARMADA JAYA MAGELANG. S1 thesis, UAJY.
Marlim, Fiona Olivia (2011) INFORMATION SYSTEM DEVELOPMENT IN “VEGETUS” VEGETARIAN MINIMARKET. S1 thesis, UAJY.
Sugeha, Rachel (2011) OPTIMIZING LABOR ALLOCATION IN MULTI-PROJECT MANAGEMENT USING CRITICAL PATH METHOD AND SENSITIVITY ANALYSIS (Case Study of CV Madya Karya Yogyakarta). S1 thesis, UAJY.