SEQUENCING AND SCHEDULING IN MIXED MODEL ASSEMBLY LINES: A CASE STUDY OF PT FEDERAL MOTOR IN INDONESIA

Purnama, Ignatius Luddy Indra (1995) SEQUENCING AND SCHEDULING IN MIXED MODEL ASSEMBLY LINES: A CASE STUDY OF PT FEDERAL MOTOR IN INDONESIA. Phd thesis, UAJY.

[img] Text (SEQUENCING AND SCHEDULING IN MIXED MODEL ASSEMBLY LINES: A CASE STUDY OF PT FEDERAL MOTOR IN INDONESIA)
IGN LUDDY INDRA P.pdf
Restricted to Repository staff only

Download (2MB)

Abstract

This research is motivated by the fact that the sequencing and scheduling of assembly operations is the most critical factor in production profitability and has great impact on the assembly line's balance, machine utilization, and even on the feasibility of the assembly line. In this research a case study for a motor cycle assembly line has been considered and will focus on mixed model assembly lines. The product will focus on 3 different product types only, with the composition production for type A, B, and C is I 00: I 00: 150 (2 lots : 2 lots : 31ots). The specific objectives of this research can be written as : (a) To check the line balancing for each product type, based on balance delay and idleness percentage; (b) Prescribe suitable scheduling rule for the assembly line out of the 7 possible methods (Campbell, Dudek, and Smith; Dannenbring; Gupta; Johnson; Stinton and Smith (Heuristic 6); Palmer; and Enumeration); and (3) To develop an effective design for the mixed model assembly lines, based on the type of operators (close or open work stations interface) and provision of buffers in the line.

Item Type: Thesis (Phd)
Uncontrolled Keywords: Sequencing, scheduling
Subjects: Teknik Informatika > Soft Computing
Divisions: Fakultas Teknologi Industri > Teknik Informatika
Depositing User: Editor UAJY
Date Deposited: 19 Dec 2017 10:03
Last Modified: 19 Dec 2017 10:03
URI: http://e-journal.uajy.ac.id/id/eprint/13265

Actions (login required)

View Item View Item