IMPLEMENTATION OF 5S LEAN MANUFACTURING METHOD IN SETIAWAN MEBEL

Gunawan, Angger Wibisono (2022) IMPLEMENTATION OF 5S LEAN MANUFACTURING METHOD IN SETIAWAN MEBEL. S1 thesis, Universitas Atma Jaya Yogyakarta.

[img]
Preview
Text (Angger Wibisono Gunawan)
151408257_Chap 0.pdf

Download (274kB) | Preview
[img]
Preview
Text (Angger Wibisono Gunawan)
151408257_Chap 1.pdf

Download (168kB) | Preview
[img]
Preview
Text
151408257_Chap 2.pdf

Download (190kB) | Preview
[img] Text
151408257_Chap 3.pdf
Restricted to Registered users only

Download (253kB)
[img] Text
151408257_Chap 4.pdf
Restricted to Registered users only

Download (207kB)
[img] Text
151408257_Chap 5.pdf
Restricted to Registered users only

Download (260kB)
[img] Text
151408257_Chap 6.pdf
Restricted to Registered users only

Download (420kB)
[img] Text
151408257_Chap 7.pdf
Restricted to Registered users only

Download (523kB)
[img]
Preview
Text
151408257_Chap 8.pdf

Download (222kB) | Preview

Abstract

Setiawan Mebel have problems regarding production time that result in customer complaints because of late production completion and/or delivery because of elements in the workplace that is not supportive and hinder the production activity of the company. The observation is done on chair and table production starting from September to October 2020. The solution that are proposed are increasing production capability and reducing production time, reducing production is chosen as the solution to solve the problem of the company because it fulfill the critical success factor. And to apply the solution 2 methods are considered, 5S and Six Sigma (DMAIC), the methods chosen is 5S because this method is more suitable for the company’s condition. The result of the research is reduction of production time by 7.82% in chair production time from 638.71 seconds/product on average to 588 seconds/product on average, and 9.58% in table production time from 798.64 seconds/product on average to 722.13 seconds/product on average. Meaning that the research that was concluded is a success, because the objective of reducing production time has been fulfilled by the research.

Item Type: Thesis (S1)
Uncontrolled Keywords: 5S, Productivity. Lean Manufacturing.
Subjects: Industrial Engineering > Quality, Safety, Health and Environtment
Divisions: Fakultas Teknologi Industri > Teknik Industri Internasional
Depositing User: Editor 3 uajy
Date Deposited: 15 Sep 2022 10:24
Last Modified: 15 Sep 2022 10:24
URI: http://e-journal.uajy.ac.id/id/eprint/27455

Actions (login required)

View Item View Item