MINIMIZING PRODUCTION LATENESS AT PT FIT USING LINE BALANCING APPROACH

Sombolayuk, Irene Anugrahati (2024) MINIMIZING PRODUCTION LATENESS AT PT FIT USING LINE BALANCING APPROACH. S1 thesis, UNIVERSITAS ATMA JAYA YOGYAKARTA.

[img]
Preview
Text (Irene Anugrahati Sombolayuk)
201410595_Chap 0.pdf

Download (541kB) | Preview
[img]
Preview
Text
201410595_Chap 1.pdf

Download (553kB) | Preview
[img]
Preview
Text
201410595_Chap 2.pdf

Download (541kB) | Preview
[img] Text
201410595_Chap 3.pdf
Restricted to Registered users only

Download (393kB)
[img] Text
201410595_Chap 4.pdf
Restricted to Registered users only

Download (394kB)
[img] Text
201410595_Chap 5.pdf
Restricted to Registered users only

Download (524kB)
[img] Text
201410595_Chap 6.pdf
Restricted to Registered users only

Download (509kB)
[img]
Preview
Text
201410595_Chap 7.pdf

Download (697kB) | Preview

Abstract

PT Furnindo Inovasi Teknologi is a company operating in the furniture industry, which produces several types of sofas. Some of the problems that occur in the company include the production process, which is currently unable to fulfill orders on time, production lateness, a lack of workers, and improper placement of tools and materials. However, the main focus of the research is on the problem of production lateness with the root cause of the bottleneck which causes the production line to be less efficient. Therefore, this research aims to reduce production lateness. The research uses cycle time data, then calculated the standard time using the working time measurement. Next, the current line efficiency value was calculated and the RPW (Ranked Positional Weight) and CPM (Critical Path Method) methods were used as the alternative solutions for improvement. Then, based on this method, line efficiency calculation and analysis of existing alternative solutions are carried out. The research results stated that there was an increase in line efficiency of 12.96% from the initial efficiency of 63.22% to 76.18%. Apart from that, this research also succeeded in reducing production lateness by 71.02%, from 20 days to 5.80 days.

Item Type: Thesis (S1)
Uncontrolled Keywords: line balancing, bottleneck, ranked positional weight, sofa production, line efficiency
Subjects: Industrial Engineering > Industrial Management
Divisions: Fakultas Teknologi Industri > Teknik Industri Internasional
Depositing User: Editor 3 uajy
Date Deposited: 20 Sep 2024 18:21
Last Modified: 20 Sep 2024 18:21
URI: http://e-journal.uajy.ac.id/id/eprint/32440

Actions (login required)

View Item View Item