ASPEK HUKUM PELIBATAN MASYARAKAT DALAM PROSES AMDAL JALAN TOL YOGYA-SOLO DI KALURAHAN PURWOMARTANI KAPANEWON KALASAN PADUKUHAN BAYEN

Maniani, Rajif Gangga (2024) ASPEK HUKUM PELIBATAN MASYARAKAT DALAM PROSES AMDAL JALAN TOL YOGYA-SOLO DI KALURAHAN PURWOMARTANI KAPANEWON KALASAN PADUKUHAN BAYEN. S1 thesis, Universitas Atma Jaya Yogyakarta.

[img] Text (Rajif Gangga Maniani)
200513901 0.pdf

Download (373kB)
[img] Text
200513901 1.pdf

Download (311kB)
[img] Text
200513901 2.pdf
Restricted to Registered users only

Download (343kB)
[img] Text
200513901 3.pdf

Download (269kB)

Abstract

The Indonesian government has power over the environment and what is in it, so it has the right to carry out development, one of which is the construction of toll roads. The construction of this toll road has an impact on the surrounding environment so an AMDAL or Environmental Impact Statement (EIS) must be made. Article 26 paragraph 2 of the UUPPLH stipulates that in the AMDAL preparation process it is mandatory to involve the community to hear their opinions. The research method used in this research is an empirical research method. This legal research uses primary data and secondary data. Primary data was obtained from interview with the source person, while the secondary data was obtained from regulations and laws, books, journals, news, the internet and research reports. The author also using qualitative methods by drawing conclusions from the results of interviews with sources and respondents. The results of this study indicate that the Bayen hamlet community affected by the construction of the Yogya-Solo toll road were not involved in the environmental impact analysis (AMDAL) process for the construction of the toll road, there was no information or announcement, and the Sleman Regency Environmental Service did not know the initiator of the construction of the Yogya-Solo toll road. This is what makes this case contradictory to Article 26 of the UUPPLH, and in the end the Bayen hamlet community was not involved in the environmental impact analysis (AMDAL) process for the construction of the Yogya-Solo toll road in Purwomartani Village, Kalasan Subdistrict.

Item Type: Thesis (S1)
Uncontrolled Keywords: Community participation, Environmental Impact Statemen,Legal Aspect.
Subjects: Ilmu Hukum > Pertanahan, Pembangunan dan Lingkungan Hidup
Divisions: Fakultas Hukum > Program Studi Ilmu Hukum
Depositing User: Editor 2 uajy
Date Deposited: 13 Dec 2024 07:40
Last Modified: 13 Dec 2024 07:40
URI: http://e-journal.uajy.ac.id/id/eprint/33194

Actions (login required)

View Item View Item