Yuniartha, Deny Ratna and Adante, Paulina Farah (2011) Penjadwalan Produksi Untuk Mengurangi Jumlah Pesanan yang Terlambat Dengan Memperhatikan Proses Krisis Pada Alokasi Kerja. . pp. 225-230. ISSN 1410-5004
Text
JTI Vol 13 No 3 Jan 2011 DRY.pdf Download (228kB) |
Abstract
This paper focusses on the scheduling problem of reducing the number of tardy order with considering the critical procee in worker allocation. Each worker has skill to do more than one processes but there are some processes that could be done only by one worker. This process is named as critical process. The prposed scheduling algorithim consist of 2 mechanism. i.e. order scheduling and worker allocation for production process stages. Order scheduling is performef using forward approach and earliest due date priority rule. Worker allocation is performed with considering availability of worker based on worker's skill, the needs of critical process, and the processes than can be done in parallel. Numerical experience using data of craft industry X shows that the proposed scheduling algorithm better performance in reducing the member of tardy order.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | scheduling, tardy order, critical process, worker allocation |
Subjects: | Teknik Industri > Sistem Kerja |
Divisions: | Fakultas Teknologi Industri > Teknik Industri |
Depositing User: | Editor UAJY |
Date Deposited: | 24 Aug 2016 13:06 |
Last Modified: | 24 Aug 2016 13:06 |
URI: | http://e-journal.uajy.ac.id/id/eprint/10189 |
Actions (login required)
View Item |