“X” BUILD PLAN BUSINESS PROCESS IMPROVEMENT AT ELECTRONIC DEVICE MANUFACTURER

SUTRILASTYO, . (2016) “X” BUILD PLAN BUSINESS PROCESS IMPROVEMENT AT ELECTRONIC DEVICE MANUFACTURER. S1 thesis, UAJY.

[img] Text (Halaman Judul)
0TII07050.pdf

Download (565kB)
[img] Text (Bab I)
1TII07050.pdf

Download (176kB)
[img] Text (Bab II)
2TII07050.pdf

Download (211kB)
[img] Text (Bab III)
3TII07050.pdf

Download (375kB)
[img] Text (Bab IV)
4TII07050.pdf
Restricted to Registered users only

Download (788kB)
[img] Text (Bab V)
5TII07050.pdf
Restricted to Registered users only

Download (888kB)
[img] Text (Bab VI)
6TII07050.pdf

Download (176kB)

Abstract

This research with the title of “X” Build Plan Business Process Improvement was conducted in Production Control Department in a multinational electronic device manufacturer. The research was started when the planner for “X” realized that there were non-value-added activities in a form of repetitive manual works. This leads to the increase of processing time that can delay the entire process. The methodology used in the research was using five general phases of business process improvement: initiation, diagnosis, design, implementation, and process management. Following the five phases, the non-value-added activities in “X” build plan are eliminated with the help of information technology by making the activities to be semi-automated. With the improvements, there is a 92% reduction in the number of manual activities, 90% in reduction of the time needed to generate the data, and 60% in reduction of the time needed to finish one build.

Item Type: Thesis (S1)
Uncontrolled Keywords: business process improvement, information technology, production control, non-value-added activities
Subjects: Teknik Industri > Produksi
Divisions: Fakultas Teknologi Industri > Teknik Industri Internasional
Depositing User: Editor UAJY
Date Deposited: 01 Feb 2017 12:25
Last Modified: 01 Feb 2017 12:25
URI: http://e-journal.uajy.ac.id/id/eprint/11036

Actions (login required)

View Item View Item