PUTRA, VINCENSIUS WIKAN KASHANA (2010) HUBUNGAN BIAYA DAN WAKTU PROYEK DENGAN TIME COST TRADE-OFF ANALYSIS (Studi Kasus: Pembangunan / Penggantian Jembatan Air Empayang Bentang 50 meter Kabupaten Lahat Provinsi Sumatra Selatan). S1 thesis, UAJY.
|
Text (Halaman Judul)
0TS11919.pdf Download (3MB) | Preview |
|
|
Text (Bab I)
1TS11919.pdf Download (829kB) | Preview |
|
|
Text (Bab II)
2TS11919.pdf Download (7MB) | Preview |
|
Text (Bab III)
3TS11919.pdf Restricted to Registered users only Download (2MB) |
||
Text (Bab IV)
4TS11919.pdf Restricted to Registered users only Download (15MB) |
||
|
Text (Bab V)
5TS11919.pdf Download (29MB) | Preview |
Item Type: | Thesis (S1) |
---|---|
Uncontrolled Keywords: | Kerja Lembur, Timw Cost Trade-Off, Waktu dan Biaya Optimal |
Subjects: | Sipil > Manajemen Konstruksi Sipil > Manajemen Konstruksi |
Divisions: | Fakultas Teknik > Program Studi Teknik Sipil |
Depositing User: | Editor UAJY |
Date Deposited: | 31 May 2013 13:32 |
Last Modified: | 31 May 2013 13:32 |
URI: | http://e-journal.uajy.ac.id/id/eprint/2000 |
Actions (login required)
View Item |