QUALITY CONTROL OF PULLEY BY IMPLEMENTING SEVEN STEPS METHOD IN PT. MITRA REKATAMA MANDIRI

PEREIRA, NELCIA MARIA GAIO ALVARES (2019) QUALITY CONTROL OF PULLEY BY IMPLEMENTING SEVEN STEPS METHOD IN PT. MITRA REKATAMA MANDIRI. S1 thesis, UAJY.

[img] Text
TF int 07513.pdf
Restricted to Repository staff only

Download (2MB)

Abstract

PT. MRM is engaged in metal casting which produces various types of metal products of farmer's engine components: Engine Pulley YST, Main Pulley YM 70, Main Pulley YCF and the next products are for components of mining machinery and the last is manhole components. The objectives of this research are how to identify the defects that often occur in the production floor by proposed improvements to reduce the product defects. Quality control that can help to reduce product defects is to use the seven steps method. Based on the analysis, many defects that occur are cracked defects and the surface of uneven products. From the analysis that has been done, the action taken to overcome the problem is an improvement in measuring the main and additional raw materials. After the action was carried out, the defect rate was reduced for cracked type defects by 39.8% and for the surface type of uneven products by 31.8%.

Item Type: Thesis (S1)
Uncontrolled Keywords: Quality Control, Seven Steps Methods, Seven Tool of Quality
Subjects: Industrial Engineering > Industrial Management
Divisions: Fakultas Teknologi Industri > Teknik Industri Internasional
Depositing User: Editor UAJY
Date Deposited: 03 Mar 2020 05:09
Last Modified: 03 Mar 2020 05:09
URI: http://e-journal.uajy.ac.id/id/eprint/21521

Actions (login required)

View Item View Item