Prototyping Operation and Maintenance System for a Campus Building

Kaming, Peter F and Prabowo, Austin P.V. and Raharjo, Ferianto and Pramesti, Nectaria Putri Prototyping Operation and Maintenance System for a Campus Building. [Research]

[img]
Preview
Text
07 POSTER RESEARCH WEEK 2020 TS.pdf

Download (15MB) | Preview

Abstract

There is increasing awareness of life cycle costing (LCC) by the management who has lengthy experience in the operation and maintenance of the building. Maintenance of buildings includes a replacement, updating, and repair building components by predetermined standards. This paper aim at developing a prototype of building maintenance system for a campus in Yogyakarta. The prototype is referred to ISO 15686 as well as Regulation of Minister of Public Works. The system complements the service life of the building components that can be updated regularly. The system accommodates the 25-years life cycle cost plan to assist campus management office. Research data obtained by Building Maintenance personals, the users of the building as well as previous studies for similar ones. From the results of life cycle costing, the study shows its detail life cycle cost plan.. Finally, a prototype for the operation and maintenance of the building is developed

Item Type: Research
Uncontrolled Keywords: operation and maintenance, campus building, ISO 15686, life cycle costing
Subjects: Sipil > Struktur
Sipil > Struktur
Divisions: Fakultas Teknik > Program Studi Teknik Sipil
Depositing User: Editor UAJY
Date Deposited: 21 Sep 2020 03:44
Last Modified: 21 Sep 2020 03:44
URI: http://e-journal.uajy.ac.id/id/eprint/22067

Actions (login required)

View Item View Item