STUDI TENTANG PEMILIHAN METODE PENGADAAN (PROCUREMENT METHOD)DALAM PROYEK KONSTRUKSI DI INDONESIA

Cahyono, Kurniawan Budi (2005) STUDI TENTANG PEMILIHAN METODE PENGADAAN (PROCUREMENT METHOD)DALAM PROYEK KONSTRUKSI DI INDONESIA. S2 thesis, UAJY.

[img] Text (Halaman Judull)
0MTS00720.pdf

Download (179kB)
[img] Text (Bab I)
1MTS00720.pdf

Download (87kB)
[img] Text (Bab II)
2MTS00720.pdf

Download (395kB)
[img] Text (Bab III)
3MTS00720.pdf
Restricted to Registered users only

Download (126kB)
[img] Text (Bab IV)
4MTS00720.pdf
Restricted to Registered users only

Download (627kB)
[img] Text (Bab V)
5MTS00720.pdf

Download (365kB)

Abstract

STUDY CONCERNING ELECTION OF PROCUREMENT METHOD IN PROJECT CONSTRUCTION IN INDONESIA, Kurniawan Budi Cahyono, 01.720/PS/MT, Februari 2005, Majoring in Construction Management, Master of Civil Engineering Program, Post-Graduate Program, University of Atma Jaya Yogyakarta. Procurement method is one of the steps or sub-sistems in construction project. There are some procurement methods expanding in Indonesia, for example : Conventional method, Design / Build method, Turnkey method and Management Construction method. Accuracy in choosing procurement method the will have an effect on in execution of construction project : speed of execution, cost , quality, involvement from every party. This research aims to analyse factors influencing election of procurement method in construction project in Indonesia. The gathering data has done by spreading questionnaire to Jakarta, Semarang, Solo, Puwokerto, Yogyakarta and Surabaya. From questionnaires which were returned, 30 questionnaire could be processed. Data analysis use SPSS software 11.0 Windows for which marginally consist of descriptive data analysis, and correlation analysis of Spearman. Result of data analysis in this research indicate that factor influencing election of Conventional method are quality level, point of responsibility and certainty. Factor influencing election of Design / Build method are quality level, price competition and complexity. Factor influencing election of Turnkey method are certainty, risk avoidance and flexibility. Factor influencing election of Management Construction method are quality level, price competition and point of responsibility. And factor influencing election of procurement method in general are quality level, certainty and price competition. Correlation analysis of Spearman show that there is significant correlation to opinion of responder group having experience use Conventional method and Management Construction method in passing an opinion concerning factors influencing election of procurement method.

Item Type: Thesis (S2)
Uncontrolled Keywords: Procurement method, Conventional method, Design / Build method, Turnkey method , Management Construction method
Subjects: Magister Teknik Sipil > Manajemen Konstruksi
Divisions: Pasca Sarjana > Magister Teknik Sipil
Depositing User: Editor UAJY
Date Deposited: 09 Sep 2015 10:03
Last Modified: 09 Sep 2015 10:03
URI: http://e-journal.uajy.ac.id/id/eprint/7906

Actions (login required)

View Item View Item