Items where Author is "Yuniartha, Deny Ratna "

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Item Type | No Grouping
Number of items: 13.

Article

Yuniartha, Deny Ratna and Adante, Paulina Farah (2011) Penjadwalan Produksi Untuk Mengurangi Jumlah Pesanan yang Terlambat Dengan Memperhatikan Proses Krisis Pada Alokasi Kerja. . pp. 225-230. ISSN 1410-5004

Conference or Workshop Item

WIBISONO, RADINAL and Ai, The Jin and Yuniartha, Deny Ratna (2018) Fleet Sizing of Automated Material Handling Using Simulation Approach. In: The 4th Asia Pacific Conference on Manufacturing Systems and the 3rd International Manufacturing Engineering Conference, 7–8 December 2017, Yogyakarta.

ANTARIKA,, ALVERA and Yuniartha, Deny Ratna and Purnama, Ign. Luddy Indra (2017) Determining Number of Workers for Front Office Using Shift Scheduling Considering Workload. In: The 18th Asia Pacific Industrial Engineering and Management System Conference, 3-6 Desember 2017, Hyatt Regency Yogyakarta.

Jockvom, Jockvom and Yuniartha, Deny Ratna and Purnama, Ign. Luddy Indra and Dewi, Luciana Triani (2016) Shift Scheduling Model Considering Workload for Housekeeping Department. In: Proceeding of Abstracts and Papers (on USB disk) of the 17th Asia Pacific Industrial Engineering and Management System Conference 2016, 7-10 Desember 20116, Taipei.

Yuniartha, Deny Ratna and Dewi, Luciana Triani and Purnama, Ign. Luddy Indra (2015) Work Load Identification of Hotel's Shift Scheduling inYogyakarta Indonesia. In: 16th Asia Pacific Industrial Engineering And Management Systems Conference (APIEMS 2015), 8 Desember 2015, Ho Chi Minh City.

Halim, Ravika and Yuniartha, Deny Ratna and Purnama, Ign. Luddy Indra (2014) Perbaikan Penjadwalan Shift di Toko Mebel Beta Jaya. In: Seminar Nasional Riset dan Teknologi Terapan (RITEKTRA) IV - 2014, 17 - 18 November 2014, Universitas Sanata Dharma Yogyakarta.

Dewi, Luciana Triani and Yuniartha, Deny Ratna and Purnama, Ign. Luddy Indra (2014) Psychosocial and Physical Workload of Hotel’s Shift Worker In Yogyakarta Indonesia. In: Proceedings of the Asia Pacific Industrial Engineering & Management Systems Conference 2014, October 12 - 15, 2014, Jeju Island, Korea.

Purnama, Ign. Luddy Indra and Yuniartha, Deny Ratna (2014) Shift-Scheduling Characteristic Identification of Non-Star Hotels Industry in Yogyakarta Indonesia. In: Proceedings of the Asia Pacific Industrial Engineering & Management Systems Conference 2014, October 12 - 15, 2014, Jeju Island, Korea.

Yuniartha, Deny Ratna (2012) Shift Pattern in Cyclic Scheduling with Between-Days Break-Time Constraint. In: Proceedings of Abstracts and Papers (on CD-ROM) of The 13th Asia Pacific Industrial Engineering and Management Systems Conference 2012 and the 15th Asia Pacific Division Meeting of the International Foundation for Production Research, 2-5 Desember 2012, Thailand, Bangkok.

Yuniartha, Deny Ratna and Halim, Abdul Hakim (2008) Dynamic Batch Scheduling for Fabrication and Assembly of Common and Multiple Unique Components in a Four Machine Flow Shop. In: The 9th Asia Pacific Industrial Engineering & Management systems Conference , 3-5 Desember 2008, Nusa Dua, Bali.

Research

Dewi, Luciana Triani and Purnama, Ign. Luddy Indra and Yuniartha, Deny Ratna DESAIN DAN IMPLEMENTASI MEJA PRODUKSI EMPING GARUT DI KELOMPOK USAHA REKSO BAWONO PRAMBANAN - SLEMAN - DIY. [Research]

Yuniartha, Deny Ratna and Purnama, Ign. Luddy Indra and Dewi, Luciana Triani IDENTIFIKASI METODE PENJADWALAN TENAGA KERJA BERBASIS BEBAN KERJA PADA INDUSTRI PERHOTELAN DI YOGYAKARTA. [Research]

Dewi, Luciana Triani and Purnama, Ignatius Luddy Indra and Yuniartha, Deny Ratna MODEL PENJADWALAN TENAGA KERJA BERBASIS BEBAN KERJA PADA INDUSTRI PERHOTELAN DI YOGYAKARTA. [Research]

This list was generated on Fri Dec 20 00:54:17 2024 WIB.