Up a level |
Pranowo, . and Soesianto, F and Suhendro, Bambang (2005) High Order Discontinuous Galerkin for Numerical Simulation of Elastic Wave Propagation. Junal tenik Industri, IX (2). pp. 85-98. ISSN 1410-5004
Uslianti, Silvia and ANGGORO, P. WISNU (2005) Perencanaan Produksi Berhirarki Produk Olahan Kayu Menggunakan Model Goal Programming. Jurnal Teknologi Industri, 9 (2). pp. 109-120. ISSN 1410-5004
Daryanto, Yosef (2005) Multi Floor Facility Layout Sebagai Alternatif Penyusunan Layout Untuk Memanfaatkan Karakteristik Lahan. In: Proceedings of The 4th National Conference Design and Application of Technology 2005.
Suharyanti, Yosephine (2005) A MODEL TO EVALUATE CAPACITY SHARING IN A MANUFACTURING NETWORK. In: International Conference on Operations and Supply Chain Management, 15-17 Desember 2005, Bali, Indonesia.
Suharyanti, Yosephine and Laniewati, . and Kusumaningrum, A. and Tjahjono, M.E. (2005) Penugasan Mesin-mesin Multi-purpose Non-identik pada Sistem Non-Fleksibel. In: SEMINAR NASIONAL “ TEKNOLOGI SIMULASI DAN APLIKASINYA UNTUK OPTIMASI INDUSTRI”, 1-2 Juni 2005, Ruang Sidang II KPTU, FT-UGM.