Musi, Maria Stela Maris (2012) THE EXAMINATION OF THE RELATION BETWEEN WORKERS PERCEPTION TOWARDS SITE ENVIORNMENT AND JOB SATISFACTION. S1 thesis, UAJY.
|
Text (Title Page)
0TSI12832.pdf Download (817kB) | Preview |
|
|
Text (Chapter I)
1TSI12832.pdf Download (220kB) | Preview |
|
|
Text (Chapter II)
2TSI12832.pdf Download (1MB) | Preview |
|
Text (Chapter III)
3TSI12832.pdf Restricted to Registered users only Download (274kB) |
||
Text (Chapter IV)
4TSI12832.pdf Restricted to Registered users only Download (879kB) |
||
|
Text (Chapter V)
5TSI12832.pdf Download (807kB) | Preview |
Abstract
Purposes – Purpose of this study is study is to find out factors that caused workers perception toward site environment and job satisfaction based on Job Satisfaction Survey by Spector. Research Limitation – This Study just measure job satisfaction of construction building worker in Yogyakarta. There are fourty respondent joined this study. Because of the small amount of respondent this study cannot reperesent job satisfaction of construction building workers in Yogyakarta, Indonesia. Metodology – This study is explanatory research. Questionnaire as the method to collect data. The data will be analyzed using statistical method by Microsoft Excell 2007 as the software. Findings – This study find that nature of work (mean: 4,22 ; sta. Deviation: 1,10) become the biggest factor that influence job satisfaction of construction building worker in Yogyakarta. Following by coworkers factor (mean: 3,96 ; sta. Deviation: 1,08), surpervisor factor (mean: 3,66 ; sta. Deviation: 1,25), fringe benefit factor (mean: 3,56 ; sta. Deviation: 1,04), communication factor (mean: 3,53 ; sta. Deviation: 1,30), payment factor (mean: 3,49 ; sta. Deviation: 0,87), operation condition factor (mean: 3,31 ; sta. Deviation: 1,03) and contingent reward factor (mean: 3,23 ; sta. Deviation: 1,20). Keywords: Job Satisfaction, Construction Building Workers in Yogyakarta
Item Type: | Thesis (S1) |
---|---|
Uncontrolled Keywords: | Job Satisfaction,Construction Building Workers in Yogyakarta |
Subjects: | Civil Engineering > Construction Management |
Divisions: | Fakultas Teknik > Teknik Sipil Internasional |
Depositing User: | Editor UAJY |
Date Deposited: | 26 Apr 2013 13:27 |
Last Modified: | 02 May 2013 13:43 |
URI: | http://e-journal.uajy.ac.id/id/eprint/950 |
Actions (login required)
View Item |