Items where Subject is "Civil Engineering > Construction Management"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type
Jump to: B | C | E | H | L | M | N | P | R | S | T | V | W | Y | Z
Number of items at this level: 37.

B

Bela, Robert Arthur (2018) FAKTOR-FAKTOR PENYEBAB PEMBENGKAKAN BIAYA PADA PROYEK KONSTRUKSI DI KOTA MAKASSAR PROVINSI SULAWESI SELATAN. S1 thesis, UAJY.

Billy, Trikobero (2018) ANALISIS FAKTOR PENENTU PRODUKTIVITAS APARATUR SIPIL NEGARA PADA PROYEK KONSTRUKSI. S1 thesis, UAJY.

Budiputra, Andreas Setiawan (2011) COST ESTIMATION WITH COST SIGNIFICANT MODEL ESPECIALLY FOR OFFICE BUILDING PROJECT. S1 thesis, UAJY.

C

CHARLIE, YADI (2014) KAJIAN TERHADAP FAKTOR-FAKTOR PENYEBAB KONFLIK PADA PROYEK KONSTRUKSI. S1 thesis, UAJY.

E

Emerensia Bellatrix, Kriswindita (2018) ANALISIS PERCEPATAN BIAYA DAN WAKTU DENGAN METODE TIME COST TRADE OFF ANALYSIS (Studi Kasus: Proyek Pembangunan Gedung Pelayanan Rumah Sakit Umum Daerah Sanjiwani Gianyar Bali). S1 thesis, UAJY.

H

Himawan, Jimmy (2011) IMPLEMENTATION OF RISK MANAGEMENT BY CONTRACTORS IN YOGYAKARTA. S1 thesis, UAJY.

L

Losa, Hendrikus Djaja (2014) Hubungan Kualifikasi Kontraktor Dengan Pengendalian Kualitas Rencana Pelaksanaan Pekerjaan Proyek Konstruksi di Kabupaten Manggarai Timur. S1 thesis, Universitas Atma Jaya.

M

Musi, Maria Stela Maris (2012) THE EXAMINATION OF THE RELATION BETWEEN WORKERS PERCEPTION TOWARDS SITE ENVIORNMENT AND JOB SATISFACTION. S1 thesis, UAJY.

N

NDIKEN, FERLI (2014) ANALISIS PENGARUH ASPEK-ASPEK PELAKSANAAN KONSTRUKSI TERHADAP KINERJA PROYEK DI LINGKUNGAN KANTOR DINAS KABUPATEN BANTUL. S1 thesis, UAJY.

P

PALAYUKAN, CHRISTIEN PRATIWI (2017) COST AND TIME STUDY OF KNOCK DOWN FORMWORK. S1 thesis, UAJY.

PATRIA, AGUSTINUS SUNGSANG NANA (2014) PENGARUH PENAMBAHAN SERAT KAWAT BENDRAT TERHADAP KUAT LENTUR BALOK MENGGUNAKAN TULANGAN MINIMUM. S1 thesis, Universitas Atma Jaya.

PRISCILIA EXELCY, BAIIN (2018) IMPLEMENTASI LIFE CYCLE ASSESSMENT (LCA) MATERIAL KAYU DAN BAJA RINGAN PADA RANGKA ATAP HUNIAN SEDERHANA. S1 thesis, UAJY.

Patresia, Elsya (2018) THE APPLICATION OF ANALYTIC NETWORK PROCESS TO REVIEW THE CAUSES OF CONSTRUCTION DISPUTES. S1 thesis, UAJY.

Permana, Putu Crishna Ardy (2013) THE RELATIONSHIP BETWEEN LEADERSHIP STYLE AND FREQUENCY OF ACCIDENTS. S1 thesis, UAJY.

Puspa, Ayuningtyas (2018) ANALISIS PERCEPATAN PROYEK MENGGUNAKAN METODE CRASHING. S1 thesis, UAJY.

Putra, F.X. Pranoto Dirhan and Cahyandari, Gerarda Orbita Ida STUDI KEPADATAN LALU LINTAS DAN FUNGSI BANGUNAN DI JALAN A.M. SANGAJI, JETIS, YOGYAKARTA. [Research]

Putra, I Gede Eka Agastya (2016) IDENTIFICATION OF BUILDING INFORMATION MODELING (BIM) SIGNIFICANCE TOWARD SUCCESSFULNESS OF THE CONSTRUCTION PROJECT IN YOGYAKARTA. S1 thesis, UAJY.

R

RATRI, MONIKA BRENNA HERNINDIA (2017) PROJECT RISK MANAGEMENT IN YOGYAKARTA. .. pp. 1-4. ISSN .

RATRI, MONIKA BRENNA HERNINDIA (2017) PROJECT RISK MANAGEMENT IN YOGYAKARTA. S1 thesis, UAJY.

ROSARIO, CLAUDIO AMOR DE (2014) ANALISIS MENGENAI PENYEBAB DAN DAMPAK PENINGKATAN BIAYA MATERIAL PADA PEKERJAAN PROYEK KONSTRUKSI. S1 thesis, Universitas Atma Jaya.

Rantepasang, Elki Ivan (2014) Kajian Perbandingan Tingkat Ekonomis Penggunaan Main Contractor dan Multi Contractor Pada Proyek Konstruksi. S1 thesis, UAJY.

S

SALU, MILENA MARIA SEQUEIRA (2014) ANALISIS PENGARUH KERJA LEMBUR TERHADAP PRODUKTIVITAS TENAGA KERJA PROYEK KONSTRUKSI. S1 thesis, UAJY.

SARI, YASINTA YERRY PERMANA (2009) INTERNAL CONFLICT ANALYSIS IN CONTRACTORS. S1 thesis, UAJY.

SETYAJI, RIZKY POER (2010) RISK MANAGEMENT OF OPERATIONAL SECTOR AT READY MIX CONCRETE COMPANY IN YOGYAKARTA. S1 thesis, UAJY.

Sadewo, Aris Putra (2018) IDENTIFYING CAUSES, EFFECTS, BENEFITS, AND REMEDIES OF CHANGE ORDERS ON BUILDING PROJECTS IN YOGYAKARTA. S1 thesis, UAJY.

Santosa, Sandy (2004) CAUSES OF ACCIDENTS IN CONSTRUCTION INDUSTRY. S1 thesis, UAJY.

Santoso, Christiani Maitreya (2014) Analisis Faktor Keterlambatan Penyelesaian Proyek Pembangunan Grand Ballroom Royal Ambarrukmo. S1 thesis, UAJY.

Sari, Dewa Ayu Apriana (2013) THE ANALYSIS OF FOREMAN PERFORMANCE ON QUALITY MANAGEMENT IMPLEMENTATION IN YOGYAKARTA CONSTRUCTION PROJECT. S1 thesis, UAJY.

Sari, Putri Monica (2014) Analisis Tingkat Efektifitas Penggunaan Metode Nilai Hasil Pada Pengendalian Proyek Konstruksi Di Yogyakarta. S1 thesis, UAJY.

T

TIANA, RAKOTONDRAINIBE A. SOLOFO (2014) A STUDY OF MAIN CONSTRUCTION DELAYS FACTORS RELATING TO PRODUCTIVITY AND QUALITY OF THE PRODUCT IN YOGYAKARTA CITY. S1 thesis, UAJY.

TRIAYU, MARTHA (2014) STUDI TENTANG PEMELIHARAAN BANGUNAN KAMPUS II GEDUNG THOMAS AQUINAS UNIVERSITAS ATMA JAYA YOGYAKARTA. S1 thesis, Universitas Atma Jaya.

V

VIVIANDA, VENNY (2018) COMPETITIVE STRATEGY AND PERFORMANCE OF CONTRACTORS IN YOGYAKARTA. S1 thesis, UAJY.

W

WIDYANINGSIH, ROSALIA (2012) STUDY OF NONLINEAR STATIC PUSHOVER ANALYSES DUE TO LATERAL LOAD PATTERNS. S1 thesis, UAJY.

WIJAYA, PERDANA KUSUMAH GONDO (2010) STABILIZATION OF CLAY BY FLY ASH AND CEMENT. S1 thesis, UAJY.

WIRATAMA, I MADE (2016) LEXURAL STRENGTH OF FIBER REINFORCED CONCRETE BEAM USING POLYPROPYLENE AS ADMIXTURE. S1 thesis, UAJY.

Y

YONATHAN, GREGORIUS EDWIN (2018) A STUDY OF APPLICATION OF UNMANNED AERIAL SYSTEMS IN CONSTRUCTION PROJECTS. S1 thesis, UAJY.

Z

ZEBUA, KARTIKA IRIANTHY (2015) A STUDY OF THE IMPACT OF CONSTRUCTION ACCIDENTS ON THE PROJECT CONTINUITY. S1 thesis, UAJY.

This list was generated on Tue Apr 23 14:06:34 2019 WIB.