Putra, I Gede Eka Agastya (2016) IDENTIFICATION OF BUILDING INFORMATION MODELING (BIM) SIGNIFICANCE TOWARD SUCCESSFULNESS OF THE CONSTRUCTION PROJECT IN YOGYAKARTA. S1 thesis, UAJY.
Text (Halaman Judul)
0TSI1314489.pdf Download (807kB) |
|
Text (Bab I)
1TSI1314489.pdf Download (122kB) |
|
Text (Bab II)
2TSI1314489.pdf Download (441kB) |
|
Text (Bab III)
3TSI1314489.pdf Restricted to Registered users only Download (151kB) |
|
Text (Bab IV)
4TSI1314489.pdf Restricted to Registered users only Download (157kB) |
|
Text (Bab V)
5TSI1314489.pdf Download (614kB) |
Abstract
Construction sector is a sector that plays an important role in the economic development in Indonesia as the existence of high rise building, toll road and tunnel work, and other construction projects that keep increasing over the time. Thus, it is required a concept that could provide a project planning activity in the best level in terms of using software supported collaborative of the parties in order to provide abilities to finish the project in a shorter period of time, excellent quality and less costly. The use of project planning by Building Information Modeling (BIM) enhanced the collaborative effort toward the team of the project. The construction manager could deliver a constructability, sequencing, value and engineering report properly. BIM can also become a pilot action to the 3D coordinator between subcontractor and vendors during early stages of planning phase. Methodology that used in this research to gather the data is by questionnaire. Data was analyed by using mean, standard deviation and percentage method. Result showed that 97% of respondents believe BIM concept is beneficial toward their project. 83% of respondents already implement about this concept and use BIM software. AutoCAD Civil 3D and AutoCAD Architect are the most used software by the construction company as 22% of them claimed used it. The impact of BIM concept in three categories of construction are observed, in the construction stage Handover the project work criteria is in the first rank with 3.8 mean and 0.8 standard deviation value, in the project activities Visualization design facility activity is in the top rank with 3.83 mean and 0.74 standard deviation value and in the project performance Minimize the risk of miscommunication is in the top of the rank with 4.03 mean and 0.71 standard deviation value. On the overall impact of BIM toward the successfulness of project Customer Satisfaction criteria is in the first rank with 3.80 mean and 0.71 standard deviation value.
Item Type: | Thesis (S1) |
---|---|
Uncontrolled Keywords: | BIM Identification, BIM Implementation, Planning, Construction Stages, Mean, Percentage |
Subjects: | Civil Engineering > Construction Management |
Divisions: | Fakultas Teknik > Teknik Sipil Internasional |
Depositing User: | Editor UAJY |
Date Deposited: | 24 Oct 2016 10:47 |
Last Modified: | 24 Oct 2016 10:47 |
URI: | http://e-journal.uajy.ac.id/id/eprint/10554 |
Actions (login required)
View Item |