IMPLEMENTATION OF RISK MANAGEMENT BY CONTRACTORS IN YOGYAKARTA

Himawan, Jimmy (2011) IMPLEMENTATION OF RISK MANAGEMENT BY CONTRACTORS IN YOGYAKARTA. S1 thesis, UAJY.

[img]
Preview
Text (Cover Title)
0TSI11465.pdf

Download (260kB) | Preview
[img]
Preview
Text (Chapter I)
1TSI11465.pdf

Download (86kB) | Preview
[img]
Preview
Text (Chapter II)
2TSI11465.pdf

Download (166kB) | Preview
[img] Text (Chapter III)
3TSI11465.pdf
Restricted to Registered users only

Download (122kB)
[img] Text (Chapter IV)
4TSI11465.pdf
Restricted to Registered users only

Download (223kB)
[img]
Preview
Text (Chapter V)
5TSI11465.pdf

Download (102kB) | Preview

Abstract

Risk is the most important part of the implementation of risk management because the risk is at the root of the object theory and the problems that used to develop techniques and analysis in tackling the risk itself. Research conducted at Large Contractor Company in Yogyakarta and which has a branch office in Yogyakarta. This research conducted using descriptive quantitative method, the research itself conducted with literature studies and field studies. In literature study, references about risk management collected from various sources, both books and journals. This study aimed to know the basic theories that support research. Field study is to conduct direct interviews with staff at the corporate contractors who understand and are directly involved with project management. The results of the research are: risk management is already applied at large contractor company in Yogyakarta.

Item Type: Thesis (S1)
Uncontrolled Keywords: risk management, and large contractor company
Subjects: Civil Engineering > Construction Management
Divisions: Fakultas Teknik > Teknik Sipil Internasional
Depositing User: Editor UAJY
Date Deposited: 23 May 2013 08:17
Last Modified: 23 May 2013 08:17
URI: http://e-journal.uajy.ac.id/id/eprint/1636

Actions (login required)

View Item View Item