Wicaksono, Agustinus Mahar (2010) DEVELOPMENT OF MASTER MODEL MACHINE FOR SPIN CASTING TECNOLOGY. S1 thesis, UAJY.
|
Text (Cover Title)
0TII04299.pdf Download (405kB) | Preview |
|
|
Text (Chapter I)
1TII04299.pdf Download (224kB) | Preview |
|
|
Text (Chapter II)
2TII04299.pdf Download (134kB) | Preview |
|
Text (Chapter III)
3TII04299.pdf Restricted to Registered users only Download (1MB) |
||
Text (Chapter IV)
4TII04299.pdf Restricted to Registered users only Download (199kB) |
||
Text (Chapter V)
5TII04299.pdf Restricted to Registered users only Download (1MB) |
||
Text (Chapter VI)
6TII04299.pdf Restricted to Registered users only Download (529kB) |
||
|
Text (Chapter VII)
7TII04299.pdf Download (226kB) | Preview |
Abstract
A master model is required before a product is actually processed in a machine. A present research build a prototype of master model machine in spin casting technology which is not reliable for production process. The present master model machine was evaluated and redesigned focused on the need of larger mold frame and eliminate prop usage to enhance the reliability of producing good quality of master product souvenirs made from tin. The evaluation was started by constructing Functional Decomposition Diagram. Later, the decomposed part list was classified to its critical function based on Function Analysis. Failure Modes Effects Analysis (FMEA) was performed to evaluate failures of current machine. Those failures were become input for redesign process. Mechanical Design Procedure, Grid Analysis, and Tree Diagram were performed during redesign process. Some defects were found during experimental works of Adaro business card holder using the new master model machine. The Cause and Effect Diagram was performed to find best solution to solve related problems. By the end of the research, master model machine with dimension 530mm x 440mm x 710mm; operating speed at 460 rpm; maximum silicone rubber dimension 204mm x 178mm x 36mm ; electricity power 373 W and Adaro business card holder product were obtained. The production time is 11, 15 minutes and the production cost per unit is IDR 10,500.00.
Item Type: | Thesis (S1) |
---|---|
Subjects: | Industrial Engineering > Industrial Management |
Divisions: | Fakultas Teknologi Industri > Teknik Industri |
Depositing User: | Editor UAJY |
Date Deposited: | 26 Jul 2013 10:25 |
Last Modified: | 26 Jul 2013 10:25 |
URI: | http://e-journal.uajy.ac.id/id/eprint/3379 |
Actions (login required)
View Item |