PERENCANAAN PEMBANGUNAN GEDUNG PROGRAM STUDI KEPERAWATAN GIGI DI KOTA KUPANG, NUSA TENGGARA TIMUR

Subho, Adita and Rompis, Ezra Marvel (2025) PERENCANAAN PEMBANGUNAN GEDUNG PROGRAM STUDI KEPERAWATAN GIGI DI KOTA KUPANG, NUSA TENGGARA TIMUR. S1 thesis, UNIVERSITAS ATMA JAYA.

[img] Text (Adita Subho dan Ezra Marvel Rompies)
200218140(0).pdf

Download (1MB)
[img] Text
200218140(1).pdf

Download (375kB)
[img] Text
200218140(2).pdf
Restricted to Registered users only

Download (2MB)
[img] Text
200218140(3).pdf
Restricted to Registered users only

Download (1MB)
[img] Text
200218140(4).pdf
Restricted to Registered users only

Download (13MB)

Abstract

The construction project of the Dental Nursing Study Program Building is located on Jl. PIET A. TALLO, LILIBA, Oebobo District, Kupang City, East Nusa Tenggara Province. This facility is designed to provide new learning support facilities for friends who want to continue their studies to college level, especially in the field of dental nursing. Structural design of the Dental Nursing Study Program Building in Kupang was carried out by considering various factors such as safety, comfort, and beauty of the building itself. The structure designed in the building is intended to be able to withstand the loads that work, both dead loads, live loads, and earthquake loads. In the design project carried out, it includes the design of the upper structure, lower structure, and cost and time management. In the design of the upper structure, it includes the roof, columns, beams, floor slabs, and stairs. Then for the design of the lower structure, it includes the sloof and foundation. In the design process of the Dental Nursing Study Program Building, it refers to SNI 1727:2020 concerning Minimum Design Load, SNI 1726:2019 concerning Earthquake Resistance Planning Procedures, SNI 2847:2019 concerning Structural Concrete Requirements for Buildings, and ACI 314R:2016 concerning Guide to Simplified Design for Reinforced Concrete Buildings. In the structural design process, it is carried out using the help of software such as ETABS and CSiCol, while the cost and time design is carried out with the help of software.

Item Type: Thesis (S1)
Uncontrolled Keywords: planning, building structure, cost and time management.
Subjects: Sipil > Geo Teknik
Sipil > Geo Teknik
Divisions: Fakultas Teknik > Program Studi Teknik Sipil
Depositing User: Unnamed user with email ksi
Date Deposited: 15 Apr 2025 12:22
Last Modified: 15 Apr 2025 12:22
URI: http://e-journal.uajy.ac.id/id/eprint/33957

Actions (login required)

View Item View Item