5S IMPLEMENTATION IN BENGKEL ABC

Putro, Christianto Raharjo (2013) 5S IMPLEMENTATION IN BENGKEL ABC. S1 thesis, UAJY.

[img]
Preview
Text (Cover Title)
0TII05711.pdf

Download (574kB) | Preview
[img]
Preview
Text (Chapter I)
1TII05711.pdf

Download (1MB) | Preview
[img]
Preview
Text (Chapter II)
2TII05711.pdf

Download (53kB) | Preview
[img] Text (Chapter III)
3TII05711.pdf
Restricted to Registered users only

Download (72kB)
[img] Text (Chapter IV)
4TII05711.pdf
Restricted to Registered users only

Download (3MB)
[img] Text (Chapter V)
5TII05711.pdf
Restricted to Registered users only

Download (5MB)
[img]
Preview
Text (Chapter VI)
6TII05711.pdf

Download (652kB) | Preview

Abstract

Bengkel ABC is a repair shop that sells spare parts and maintains motorcycle. In addition, there are unused parts (waste) from maintenance activity. Therefore, Bengkel ABC has to organize two types of parts inside the shop, which are new spare parts and waste. In point of fact, the employees did not know how to organize spare parts and wastes in a good order. This research uses 5S as a tool to organize spare parts and wastes in Bengkel ABC. 5S consists of 5 steps, which are; seiri (sort), seiton (straighten), seiso (shine), seiketsu (standardize), and shitsuke (sustain). This research evaluated by 5 performance evaluation, there are; free space, payback period, service time data, interview, and questionnaire. Based on the 5 performance evaluation, 5S implementation in Bengkel ABC results several condition. There are 30,200cm2 more space after 5S implementation and affect the owner to utilizes these free space to increases the number of stocks. In fact that this research invests some money to make improvements, the company gets their investment in implement 5S back in 48 days. The average service time are decreased by 4.56 and 10,83 seconds respectively for employee A and Employee B. Based on the questionnaire, both employees and customers give positive respons to the effect of 5S.

Item Type: Thesis (S1)
Uncontrolled Keywords: Keywords: 5S, repair shop, waste, free space, payback period, service time, interview, questionnaire.
Subjects: Industrial Engineering > Logistics and Supply Chain Management
Divisions: Fakultas Teknologi Industri > Teknik Industri Internasional
Depositing User: Editor UAJY
Date Deposited: 08 Nov 2013 10:09
Last Modified: 08 Nov 2013 10:09
URI: http://e-journal.uajy.ac.id/id/eprint/4233

Actions (login required)

View Item View Item