Putro, Christianto Raharjo (2013) 5S IMPLEMENTATION IN BENGKEL ABC. S1 thesis, UAJY.
|
Text (Cover Title)
0TII05711.pdf Download (574kB) | Preview |
|
|
Text (Chapter I)
1TII05711.pdf Download (1MB) | Preview |
|
|
Text (Chapter II)
2TII05711.pdf Download (53kB) | Preview |
|
Text (Chapter III)
3TII05711.pdf Restricted to Registered users only Download (72kB) |
||
Text (Chapter IV)
4TII05711.pdf Restricted to Registered users only Download (3MB) |
||
Text (Chapter V)
5TII05711.pdf Restricted to Registered users only Download (5MB) |
||
|
Text (Chapter VI)
6TII05711.pdf Download (652kB) | Preview |
Abstract
Bengkel ABC is a repair shop that sells spare parts and maintains motorcycle. In addition, there are unused parts (waste) from maintenance activity. Therefore, Bengkel ABC has to organize two types of parts inside the shop, which are new spare parts and waste. In point of fact, the employees did not know how to organize spare parts and wastes in a good order. This research uses 5S as a tool to organize spare parts and wastes in Bengkel ABC. 5S consists of 5 steps, which are; seiri (sort), seiton (straighten), seiso (shine), seiketsu (standardize), and shitsuke (sustain). This research evaluated by 5 performance evaluation, there are; free space, payback period, service time data, interview, and questionnaire. Based on the 5 performance evaluation, 5S implementation in Bengkel ABC results several condition. There are 30,200cm2 more space after 5S implementation and affect the owner to utilizes these free space to increases the number of stocks. In fact that this research invests some money to make improvements, the company gets their investment in implement 5S back in 48 days. The average service time are decreased by 4.56 and 10,83 seconds respectively for employee A and Employee B. Based on the questionnaire, both employees and customers give positive respons to the effect of 5S.
Item Type: | Thesis (S1) |
---|---|
Uncontrolled Keywords: | Keywords: 5S, repair shop, waste, free space, payback period, service time, interview, questionnaire. |
Subjects: | Industrial Engineering > Logistics and Supply Chain Management |
Divisions: | Fakultas Teknologi Industri > Teknik Industri Internasional |
Depositing User: | Editor UAJY |
Date Deposited: | 08 Nov 2013 10:09 |
Last Modified: | 08 Nov 2013 10:09 |
URI: | http://e-journal.uajy.ac.id/id/eprint/4233 |
Actions (login required)
View Item |