REDESIGN THE STRUCTURE AND CONSTRUCTION MANAGEMENT OF ASSALAFFIYAH ISLAMIC BOARDING SCHOOL

Frananda, Alby Reiji and Sangke, Alfedo Ago and Paramaarta, Antonio Chistopher (2023) REDESIGN THE STRUCTURE AND CONSTRUCTION MANAGEMENT OF ASSALAFFIYAH ISLAMIC BOARDING SCHOOL. S1 thesis, Universitas Atma Jaya Yogyakarta.

[img]
Preview
Text (Alby Reiji Frananda, Alfedo Ago Sangke dan Antonio Chistopher P)
191317872_Chap 0.pdf

Download (546kB) | Preview
[img]
Preview
Text
191317872_Chap 1.pdf

Download (190kB) | Preview
[img]
Preview
Text
191317872_Chap 2.pdf

Download (2MB) | Preview
[img] Text
191317872_Chap 3.pdf
Restricted to Registered users only

Download (1MB)
[img] Text
191317872_Chap 4.pdf
Restricted to Registered users only

Download (681kB)
[img]
Preview
Text
191317872_Chap 5.pdf

Download (167kB) | Preview

Abstract

The infrastructure design final project report is one of the requirements for obtaining a Bachelor's degree from Atma Jaya University, Yogyakarta for the Civil Engineering study program. The final report is given to students as the final form of learning that has been obtained and studied during the lecture process, with the aim of creating competent undergraduate graduates as infrastructure planners in the field of civil engineering as outlined in this final report. This final project report was prepared by a Group Team consisting of: Antonio Christopher Paramaarta (191317696), Alfredo Ago Sangke (191317697) and Alby Reiji Frananda (191317872). The learning process and the preparation of this report are carried out offline accompanied by supervisors and teaching lecturers. The content of this report is the application of all the compulsory learning that we got during lectures. The design that has been carried out covers three areas, including superstructure design and substructure planning, geotechnical and construction management which in each work process has a correlation between one another. In this final project, the project given to our group is the Assallafiyah Islamic Boarding School which is located in Mlangi Hamlet, Nogotirto Village, Gamping District, Sleman Regency, Yogyakarta Special Region. Pondok Pesantren Assalafiyyah I consists of 2 main buildings, namely the dormitory building and the educational building which consists of 3 floors in each building. This planning includes planning of the upper structure, planning of the lower structure and also planning of costs and time. In building design, calculations and analysis use the LRFD (Load Resistance and Factor Design) method and this building plan follows the SNI (Indonesian National Standard) which is useful for making a plan according to applicable standards made by experts in the field of Civil Engineering so that the quality of a plan can be accounted for from the aspect of quality and strength of a building plan that we make. The structural design of the Assalaffiyah I Islamic Boarding School starts from the roof. The roofs of these two buildings use pyramid-shaped roofs according to architectural drawings which are combined with stone and welding as the joints. Then the two buildings have the same column size with dimensions of 50 cm x 50 cm, and five types of main beams and three types of beams. In planning floor slabs, the educational building has eleven 11 types of plates that use 1-way reinforcement and 2 types of plates that use 2-way reinforcement. While the dormitory building has 5 types of 1-way plates and 4 types of 2-way plates and finally for the type of stairs using 1 type of ladder in these two buildings. In the geotechnical field, the land in the Assalaffiyah I Islamic Boarding School area is included in the normal consolidation category from the assumption that the land has never been used as an infrastructure facility before, with medium soil sites (SD) from the Spectrum Response Website data. So this project uses a deep foundation, which is divided into single and combined foundations. The construction management design for the Assalafiyah Islamic Boarding School Project includes the work of compiling the Work Breakdown Structure (WBS), calculating work volume, analyzing unit prices, calculating work duration, network diagrams, s-curves, resource scheduling and budget plans. So from these calculations, this project takes 570 days for the duration of the construction of the two buildings and costs approximately Rp. 20,691,031,736.53 for these two buildings.

Item Type: Thesis (S1)
Uncontrolled Keywords: pondok pesantren, building design, geotech design, project management
Subjects: Civil Engineering > Construction Management
Divisions: Fakultas Teknik > Teknik Sipil Internasional
Depositing User: Editor 3 uajy
Date Deposited: 16 Jun 2023 16:17
Last Modified: 16 Jun 2023 16:17
URI: http://e-journal.uajy.ac.id/id/eprint/29147

Actions (login required)

View Item View Item