Items where Division is "Fakultas Teknologi Industri > Teknik Industri" and Year is 2008

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type | No Grouping
Number of items: 34.

Conference or Workshop Item

ARIYONO, VINCENTIUS and Suharyanti, Yosephine (2008) The Effect of Product Structure Complexity and Setup Time-Run Time Ratio (R) on Makespan in Multilevel Product Scheduling. In: The 9th Asia Pasific Industrial Engineering & Management Systems Conference 2008, (APIEMS 2008), 3-5 Desember 2008, Nusa Dua, Bali.

Ai, The Jin and Kachitvichyanukul, Voratas (2008) Adaptive particle swarm optimization algorithms. In: Proceedings of the International Conference on Intelligent Logistics Systems, 21-230Agustus 2008, Shanghai Maritime University, China.

Ai, The Jin and Kachitvichyanukul, Voratas (2008) Adaptive particle swarm optimization algorithms. In: International Conference on Intelligent Logistics Systems, 21-23 Agustus 2008, Shanghai, China.

Ai, The Jin and Kachitvichyanukul, Voratas (2008) A Study on Adaptive Particle Swarm Optimization for Solving Vehicle Routing Problems. In: Asia Pasific Industrial and Engineering Management System (APIEMS) Conference, 3-5 Desember 2008, Nusa Dua, Bali.

Ai, The Jin and Kachitvichyanukul, Voratas (2008) A Study on Adaptive Particle Swarm Optimization for Solving Vehicle Routing Problems. In: Proceedings of the 9th Asia Pasific Industrial Engineering & Management Systems Conference, 3-5 Desember 2008, Nusa Dua, Bali - INDONESIA.

Suharyanti, Yosephine and Purnama, Ign. Luddy Indra and Suyoto, . (2008) PENGEMBANGAN MODEL SISTEM INFORMASI UNTUK USAHA MIKRO, KECIL, DAN MENENGAH PADA INDUSTRI HANDCRAFT DI DAERAH ISTIMEWA YOGYAKARTA. In: Seminar Nasional "Membangun Ketahanan Ekonomi Nasional yang Kokoh dan Berkelanjutan untuk Menghadapi Perubahan Jaman, 24 – 25 Oktober 2008, Yogyakarta, Indonesia.

Yuniartha, Deny Ratna and Halim, Abdul Hakim (2008) Dynamic Batch Scheduling for Fabrication and Assembly of Common and Multiple Unique Components in a Four Machine Flow Shop. In: The 9th Asia Pacific Industrial Engineering & Management systems Conference , 3-5 Desember 2008, Nusa Dua, Bali.

Thesis

., Lestianingsih (2008) PENGARUH UKURAN LOT TERHADAP MAKESPAN MINIMUM DALAM PENJADWALAN PRODUK MULTILEVEL (Studi terhadap Struktur Produk 2 Level Sampai 5 Level dengan Jumlah Item Tiap Level 1 Unit). S1 thesis, UAJY.

ALEXANDER, . (2008) ANALISIS KELAYAKAN INVESTASI PEMBUKAAN LAHAN BARU PERKEBUNAN KELAPA SAWIT. S1 thesis, UAJY.

Christanti , Elisabet Veriani (2008) ANALISIS FAKTOR LOYALITAS PELANGGAN PT. EXELCOMINDO DI YOGYAKARTA. S1 thesis, UAJY.

Dasi, Putu Murti Krisna Dewi (2008) USULAN PERANCANGAN ULANG TATA LETAK FASILITAS (STUDI KASUS DI CV. APNDANUS INTERNUSA YOGYAKARTA. S1 thesis, UAJY.

Dwijayanto, Triwisnu (2008) ANALISIS BIOMEKANIKA POSTUR TUBUH OPERATOR MESIN TRUCK TIRE BUILDING BERDASARKAN HASIL RISK ASSESSMENT (STUDI KASUS DI PT. GOODYEAR, TBK. BOGOR). S1 thesis, UAJY.

Hapsari, Novena Christie (2008) TTHE EFFECT OF LOT SIZE AND PRODUCT STRUCTURE ON MAKESPAN MINIMIZATION IN MULTILEVEL PRODUCT SCHEDULING (Due to 3 Levels of Product Structure with Maximum Parts Are 4 in Each Level). S1 thesis, UAJY.

Indawati, Agustina Dika (2008) ESTIMASI BIAYA KONTRAK PERAWATAN UNTUK SEPEDA MOTOR TIPE NF100. S1 thesis, UAJY.

Kurnianingsih, Maria Rosarina (2008) PENGENDALIAN PERSEDIAAN BAHAN BAKU MATERIAL SPA (STUDI KASUS DI CV KEDHATON BY KHATULISTIWA). S1 thesis, UAJY.

Kusumawati, Ertrina Dyahayu (2008) ANALISIS KELAYAKAN INVESTASI PENGADAAN MESIN EVAPORASI Studi Kasus di GKSI, Boyolali. S1 thesis, UAJY.

Manalu, Roswita (2008) PENGENDALIAN PRODUKSI DI PERUSAHAAN ALUMINIUM ED (Studi Kasus Perusahaan Aluminium Ed Yogyakarta). S1 thesis, UAJY.

Melinda, Odilia (2008) ANALISIS KUALITAS JASA DENGAN MODIFIED QUALITY FUNCTION DEPLOYMENT (Studi Kasus: Kencana Art Photography, Yogyakarta). S1 thesis, UAJY.

Muliati, Yuli (2008) ANALISIS RISIKO KEGAGALAN SISTEM, DESAIN DAN PROSES PADA PRODUK ELECTRIC OPERATING TABLE-52502E DENGAN METODE RISK FAILURE MODE AND EFFECT ANALYSIS (RFMEA) (Studi Kasus di PT Mega Andalan Kalasan, Yogyakarta). S1 thesis, UAJY.

Novietaningrum, Cicilia Dyah Ary (2008) EVALUASI WAKTU PENGUJIAN SAMPEL HEMATOLOGI DENGAN METODE BUSINESS PROCESS MAPPING Studi Kasus: Laboratorium Rumah Sakit Panti Rapih Yogyakarta. S1 thesis, UAJY.

Nugraha, Yosia Ongky Dwi (2008) PERANCANGAN ALAT PEMINDAH BIJI KOPI BERDASARKAN ANALISIS POSTUR KERJA (STUDI KASUS DI PT NAKASARA KEJORA). S1 thesis, UAJY.

Pamungkas, Adji Yunanto (2008) PENGEMBANGAN APLIKASI SINKRONISASI DATA PERSONAL KOMPUTER DENGAN PERSONAL DIGITAL ASSISTANT MELALUI BLUETOOTH. S1 thesis, UAJY.

Prabowo, Thomas Luis (2008) ANALISIS PENGARUH KLAKSON DAN LAMPU TERHADAP PERFORMANSI KERJA PENGENDARA SEPEDA MOTOR. S1 thesis, UAJY.

Pravita Sari, Monikha (2008) PENGARUH UKURAN LOT TERHADAP MAKESPAN MINIMUM DALAM PENJADWALAN PRODUK MULTILEVEL. S1 thesis, UAJY.

Sinaga, Alfredo Janfreddy (2008) PROGRAM BANTU UNTUK MENENTUKAN KETERSEDIAAN BAHAN BAKU Studi Kasus Di PT BUDI MANUNGGAL. S1 thesis, UAJY.

Sudjono, Rieske Pramudita (2008) PEMBANGUNAN APLIKASI REMOTE PERSONAL COMPUTER DENGAN TELEPON SELULAR MELALUI BLUETOOTH. S1 thesis, UAJY.

Suprapto, . (2008) PROGRAM PENJADWALAN JOB SHOP DENGAN PENDEKATAN THEORY OF CONSTRAINT. S1 thesis, UAJY.

Triharsono, Benediktus Aruno (2008) ANALISIS PERENCANAAN PROSES PRODUKSI GANTUNGAN KUNCI BERBAHAN KAERT EMBLEM DENGAN CETAKAN SILICONE RUBBER. S1 thesis, UAJY.

Twistahayu, Teresa Dian (2008) STUDI ANT SYSTEM DALAM PENJADWALAN JOB SHOP. S1 thesis, UAJY.

Wahono, Shelawati (2008) ANALISIS PENGGUNAAN SISTEM JUNBIKI (Studi Kasus di PT. Toyota Motor Manufacturing Indonesia). S1 thesis, UAJY.

Widhiandani, Maria Resessia (2008) PERANCANGAN BINHOWER PORTABEL. S1 thesis, UAJY.

Widuri, M. Retno (2008) APLIKASI ASSEMBLY SEQUENCE METHOD UNTUK PEKERJAAN PERAWATAN Studi Kasus: Spray Gun, Meiji F-100. S1 thesis, UAJY.

Widyatama, Yohanes David (2008) PENGEMBANGAN APLIKASI IP FILTERING MENGGUNAKAN IPSECCMD BERBASIS JAVA. S1 thesis, UAJY.

Wiesan, . (2008) DESAIN APLIKASI SMS GATEWAY UNTUK SISTEM INFORMASI. S1 thesis, UAJY.

This list was generated on Wed Nov 20 00:41:24 2024 WIB.