THE IMPLEMENTATION OF CIVIL ENGINEERING RISK MANAGEMENT AS A FIELD SUPERVISOR AT PT. PUTRA MATARAM PERKASA FOR PT BIRO REMAJA ARGACIPTA PRODUCTION BUILDING

Soetardji, Arrian Fernaldi (2024) THE IMPLEMENTATION OF CIVIL ENGINEERING RISK MANAGEMENT AS A FIELD SUPERVISOR AT PT. PUTRA MATARAM PERKASA FOR PT BIRO REMAJA ARGACIPTA PRODUCTION BUILDING. S1 thesis, UNIVERSITAS ATMA JAYA YOGYAKARTA.

[img]
Preview
Text (Arrian Fernaldi Soetardji)
201318353_Chap 0.pdf

Download (1MB) | Preview
[img]
Preview
Text
201318353_Chap 1.pdf

Download (251kB) | Preview
[img]
Preview
Text
201318353_Chap 2.pdf

Download (2MB) | Preview
[img] Text
201318353_Chap 3.pdf
Restricted to Registered users only

Download (810kB)
[img] Text
201318353_Chap 4.pdf
Restricted to Registered users only

Download (296kB)
[img]
Preview
Text
201318353_Chap 5.pdf

Download (2MB) | Preview

Abstract

The manufacturing facility of PT Biro Remaja Argacipta constitutes a provisional edifice conceived in response to a noteworthy disruption in factory operations resultant from an occupational incident culminating in the conflagration of the primary production edifice. This interim establishment is situated in Bantul, precisely delineated at Jl. Lingkar Selatan, Ds Singosaren Banguntapan, Bantul, D.I Yogyakarta 55193, Indonesia. Occupying an approximate expanse of 9,4322 square meters, the project is geographically sited within the Bantul Region of the Special Region of Yogyakarta. The contiguous periphery of the project locus is predominantly characterized by agricultural tracts dedicated to rice cultivation, interspersed with select residential structures. Structurally, the edifice is designed to incorporate heavy steel as the principal load-bearing element within its architectural framework. Boasting a towering elevation of 32 meters and an expansive roof span of 12 meters, the construction methodology employs the HoneyComb technique, wherein a steel rod is dissected, subjected to fabrication, and subsequently amalgamated into a novel structural configuration. In the capacity of a field supervisor, the ensuing discourse delineates the oversight and managerial purview exercised over the workforce deployed at this locale. PT Busana Remaja Argacipta, predominantly engaged in the fabrication of apparel, confronted formidable operational impediments consequent to an incendiary event in December 2022 at its primary facility. Consequently, the erection of the temporary production site materialized as a strategic endeavor to palliate the ramifications on production and hasten the recuperation of elapsed manufacturing temporalities. It is imperative to note that the envisaged occupation of this facility encompasses the housing of large-scale machinery, thereby necessitating a structurally robust edifice capable of accommodating these formidable mechanical assets. According to the schematic, these machinery installations are slated for placement on the inaugural and secondary floors of the edifice.

Item Type: Thesis (S1)
Uncontrolled Keywords: Factory Building, Castella, Project Management.
Subjects: Civil Engineering > Construction Management
Divisions: Fakultas Teknik > Teknik Sipil Internasional
Depositing User: Editor 3 uajy
Date Deposited: 29 May 2024 17:27
Last Modified: 29 May 2024 17:27
URI: http://e-journal.uajy.ac.id/id/eprint/31735

Actions (login required)

View Item View Item